Rockstar Climbing Ltd Create Secondary Spend Opportunity with Mezzanine Installation

Contents

The Client

Rockstar Climbing is a Swindon-based climbing leisure facility and has provided indoor climbing walls to people of all ages and abilities since 2015.

In addition to offering leisure climbing, they arrange events, parties and courses with NICAS and NIBAS accredited climbing coaches.

The Challenge

The climbing company required a bespoke mezzanine structure that would support a café and viewing area for spectators who wish to observe the climbing and bouldering walls.

Hi-Level were appointed to design, manufacture and install the mezzanine and it was crucial we were able to deliver to the agreed deadline, as there were further development plans after we completed the mezzanine section of their project.

The Criteria

The final requirements of the project were detailed as follows:

  • 145m² floor size
  • 4kN/m² live load
  • Ancillaries: 27m public access handrail and general access staircase
  • Fire protection

The Solution and Result

Our expert team was able to install the mezzanine structure over a two-day period which meant that Rockstar’s overall development plan was able to stay on schedule.

The end result has enabled Rockstar to increase their footprint and spectators can now feel more part of the action in this thrilling community facility.

Looking for a budget mezzanine price?

Use our simple budget calculator below to get an instant mezzanine floor costing.

Quote Request

Quote Request

Your Details


Supporting Files

Please attach any supporting drawings, plans and photographs that may be of assistance to us in preparing your quote. Simply click on the choose files button below to locate these files on your computer or network.


Contact Us

Enquiry Form